Tucker

Town of Davis Advertisement for Bids

Legal
1109 1116
Town of Davis
Tucker Boulder Park Boulders
Davis, West Virginia
ADVERTISEMENT FOR BIDS
Sealed bids will be received by the Town of Davis, c/o Tucker Community Foundation, 737 William Ave., Suite 1, Davis, WV 26260, until 2:00 P.M., December 1, 2016, for the following work:
Construction of two (2) concrete climbing boulder
foundation slabs; installation of rubber mulch play surface;
concrete paved handicap parking pad; stone paved walk-
way; and other incidental construction in accordance with
the drawings and specifications prepared by Chapman
Technical Group.
The bid prices shall include the costs for furnishing labor and materials and performing all work set forth in the Advertisement for Bids, Information for Bidders, Form of Proposal, General Conditions of the Contract for Construction, Supplemental General Conditions and Detail Specifications and Drawings prepared by Chapman Technical Group. Immediately following the scheduled closing time for the reception of bids, all proposals which have been submitted in accordance with the required provisions will be publicly opened and read aloud.
Contract time limit is 90 calendar days.
Each prospective Bidder shall be required to acquire a minimum of one copy of the Bidding Documents which consist of specifications. Bidding Documents may be examined at the following places:
Tucker Community Foundation    Chapman Technical Group
737 William Ave., Suite 1    200 Sixth Avenue
Davis, WV 26260    St. Albans, WV 25177
Plans and Specifications may be obtained by each Bidder from the office of Chapman Technical Group, 200 Sixth Avenue, St. Albans, West Virginia 25177, telephone (304) 727-5501, upon payment of a $25.00 non-refundable deposit, or they may be ordered from the online Plan Room at www.chaptech.com.
All bidding documents shall be submitted in a single envelope addressed to the Owner marked with the following information in the lower left hand corner:
“Name and Address of Bidder”
Town of Davis
Bid for Tucker Boulder Park Sitework
To be opened at 2:00 PM, LPT, December 1, 2016
No Bid may be withdrawn for a period of ninety (90) days after the time of the opening of the Bids. Any Contractor submitting a Bid on this project hereby certifies, indicates, and acknowledges that he has a valid WV Contractor’s license and meets all the qualifications required by the statutes of the State and subdivision in which the work is to be performed. The Town of Davis reserves the right to reject any or all Bids.
Town of Davis
BY: Joe Drenning, Mayor