AIR QUALITY
PERMIT NOTICE
Notice of Application
Notice is given that SWN Production Company, LLC has applied to the West Virginia Department of Environmental Protection, Division of Air Quality, for a general permit registration for a natural gas production facility (Glenn Didriksen Pad) located in Ohio County, West Virginia. From Interstate 70, take exit 5, Tridelphia and Elm Grove to US route 40. Take US 40 east approximately 7.8 miles to Atkinson Cross CR-45. Turn left on CR-45 and travel 1.2 miles to the intersection of CR-45 and CR-47. Turn left on CR-45 and GC&P road CR-37 and travel 0.8 miles to CR-45 and CR-37 intersection. Stay straight on CR-37, GC&P. Latitude and longitude coordinates are 40.119060/-80.597750.
The applicant estimates the potential to discharge the following Regulated Air Pollutants will be:
Nitrogen Oxides (NOx)
21.79 tons/yr
Carbon Monoxide (CO)
38.68 tons/yr
Volatile Organic Compounds (VOC)
89.20 tons/yr
Sulfur Dioxide (SO2)
0.08 tons/yr
Particulate Matter (PM)
12.49 tons/yr
Acetaldehyde
0.06 tons/yr
Acrolein
0.05 tons/yr
Benzene
0.09 tons/yr
Ethylbenzene
0.35 tons/yr
Formaldehyde
0.36 tons/yr
Methanol
0.06 tons/yr
n-Hexane
4.93 tons/yr
Toluene
0.34 tons/yr
Xylenes
1.20 tons/yr
Carbon Dioxide
17,449.43 tons/yr
Methane
5.07 tons/yr
Nitrous Oxide
0.03 tons/yr
CO2 Equivalent
17,585,87 tons/yr
Construction is planned to begin on or about October 6, 2015. Written comments will be received by the West Virginia Department of Environmental Protection, Division of Air Quality, 601 57th Street, SE, Charleston, WV 25304, for at least 30 calendar days from the date of publication of this notice.
Any questions regarding this permit application should be directed to the DAQ at (304) 926-0499, extension 1227, during normal business hours.
Dated this the 20th of August, 2015
By:SWN Production
Company, LLC
Paul Geiger
Senior Vice President – Ops Management
10000 Energy Drive
Spring, TX 77389
Int. Aug. 24, 2015
234643
