Mingo

04/09/2025|234307|Legal Notices|Williamson Utility Board Repairs at 317 East 3rd Avenue Scope of Work Room 1 (Approximately 260 sq.ft.) – Replace tile flooring – Install new door – Install new drop ceiling – Install drywall on walls – Install new door – Painting of drywall on walls Room 2 (Approximately 144 sq.ft) – Replace tiles flooring – Install new drop ceiling – Install drywall on walls – Painting of drywall installed Bottom Floor – Install new insulation – Install lighting in drop ceiling Top Floor office area (Approximately 720 sq.ft.) – Install new drywall – Install new insulation – Replace subfloor – Install new lights – Install new ductwork for HVAC – Install two windows (2′ x 3′) – Repair electrical connections in damaged areas – Install new carpet – Install (4) interior doors – Painting of all new drywall hung Tool Room (Approximately 27′ x 10′) – Replace 4′ section of lower wall around entire room – Replace any wet/ damaged insulation All areas where wood will not be replaced it will need to be cleaned and capped before installing products over top of. If you would like to schedule a site visit please contact City Hall between hours of 8:30am – 4:00pm Monday – Friday at (304) 235-1510 or walk in. All bidders must seal their bids and include the following with their proposal; West Virginia Business License

Proof of Business Insurance and delivered to City Hall no later than 4:00pm Friday April 18 2025. All bids will opened on April 24 2025 at the regular scheduled council meeting. LH-234307 04-09 16 23;2025 |~

Counties