PUBLIC SERVICE COMMISSION OF WEST VIRGINIA CHARLESTON CASE NO. 24-0557-WS-DSIC

PUBLIC SERVICE COMMISSION

OF WEST VIRGINIA

CHARLESTON

CASE NO. 24-0557-WS-DSIC

WEST VIRGINIA-AMERICAN WATER COMPANY

2025 Distribution System Improvement Charge.

NOTICE OF FILING & HEARING

On June 28, 2024, West Virginia-American Water Company (WVAWC) filed an

application for approval of a Distribution System Improvement Plan and Charge

(Application) pursuant to the direction of the Public Service Commission of West

Virginia (Commission) in its February 24, 2016 order that resolved WVAWC’s 2015

rate application, Case Nos. 15-0675-S-42T and 15-0676-W-42T.

WVAWC proposes to invest approximately $40.6 million in water and $3.2 million

in wastewater infrastructure replacement and system upgrades in 2025. The

investment will include the replacement of transmission and distribution mains,

hydrants, water service lines, meters, wastewater collection mains, manholes,

wastewater service lines, pumping equipment, treatment and disposal equipment,

and investment in troubled systems. To recover the costs related to the investment

WVAWC is requesting an increase to its Distribution System Improvement Charge

(DSIC). The projects proposed for 2025 are identified in the Application, which is

on file and available for public inspection at the Commission’s offices at 201

Brooks Street, Charleston, West Virginia, and may be viewed on the Commission’s

website, www.psc.state.wv.us.

As with the DSIC currently in place, WVAWC proposes to recover costs associated

with these investments through a separate rate component on customer

bills, calculated as a percentage of the total monthly bill for service (comprised of

both the minimum meter charge and the volumetric rate component). WVAWC

proposes to include a wastewater system improvement charge as a component

of the DSIC rate component to recover proposed qualified investment in wastewater

utility plant as authorized by the Commission in its March 1, 2024 order in

Case No. 23-0558-WS-DSIC. The proposed DSIC rate combines the Company’s

DSIC qualified wastewater revenue requirement with its water revenue requirement

to calculate a single DSIC rate that is the same percentage adder for both

water and wastewater customers.

WVAWC projects that if rate increments are approved as requested, the current

4.23% DSIC/WSIC adder will be increased to 7.01%, representing an increase of

approximately 2.78% for average monthly usage bills. The average monthly bill

for its various classes of water and sewer customers will change as follows:

Water Service DSIC Rate of 7.01%

Customer Class $ Increase % Increase Average Usage

Residential $1.94 2.78% 3,000 gallons per month

Commercial $10.31 2.78% 16,000 gallons per month

Industrial $252.79 2.78% 650,000 gallons per month

Other Public Authority $43.80 2.78% 33,000 gallons per month

Sale for Resale $1,509.74 2.78% 5,652,000 gallons per month

Wastewater Service WSIC Rate of 7.01%

Customer Class $ Increase % Increase Average Usage

Residential $2.00 2.78% 3,000 gallons per month

Commercial $9.56 2.78% 16,000 gallons per month

Industrial $378.49 2.78% 650,000 gallons per month

Other Public Authority $19.46 2.78% 33,000 gallons per month

Sale for Resale $ N/A 2.78% 5,652,000 gallons per month

The increases shown above are based on averages of all customers in the indicated

class. Each class may receive an increase greater or less than stated

here. Individual customers may receive increases that are greater or less than average.

The requested rates and charges are only a proposal and are subject to

changes (increases or decreases) by the Public Service Commission in its review

of the filing. The new DSIC rate increment will become effective as ordered by the

Commission.

The Commission set a hearing date on the Application which will begin at 9:30

a.m. on November 6, 2024, in the Howard M. Cunningham Hearing Room at the

Commission’s offices at 201 Brooks Street, Charleston, West Virginia. The Commission

may cancel the hearing for good cause shown. Interested persons intending

to attend the hearing should monitor the web docket.

Anyone desiring to protest or intervene should file a written protest or request

to intervene that briefly states the reason for the protest or request to intervene.

Requests to intervene must comply with the rules on intervention set forth in the

Commission’s Rules of Practice and Procedure and must be filed within twenty

(20) days following the date of this publication unless otherwise modified by Commission

order. The Commission will receive public comments throughout the entirety

of the proceeding. All written comments and requests to intervene should

state the case name and number and be addressed to Karen Buckley, Executive

Secretary, P.O. Box 812, Charleston, West Virginia 25323. Public comments may

also be filed online at http://www.psc.state.wv.us/scripts/onlinecomments/default.

cfm by clicking the “Formal Case” link.

WEST VIRGINIA-AMERICAN WATER COMPANY

7-31-1tm