PUBLIC SERVICE COMMISSION OF WEST VIRGINIA CHARLESTON

PUBLIC SERVICE COMMISSION OF

WEST VIRGINIA CHARLESTON

 

CASE NO. 15-2002-E-IRP

MONONGAHELA POWER COMPANY and

THE POTOMAC EDISON COMPANY

 

CASE NO. 15-2003-E-IRP

APPALACHIAN POWER COMPANY

 

CASE NO. 15-2004-E-IRP

WHEELING POWER COMPANY

 

CASE NO. 15-2009-E-IRP

CITY OF NEW MARTINSVILLE

 

CASE NO. 15-2010-E-IRP

HARRISON RURAL ELECTRIFICATION ASSOCIATION, INC.

 

CASE NO. 16-0066-E-1RP

CRAIG-BOTETOURT ELECTRIC COOPERATIVE

 

and

 

CASE NO. 16-0067-E-IRP

CITY OF PHILIPPI

 

NOTICE OF FILING OF INTEGRATED RESOURCE PLAN AND OPPORTUNITY TO COMMENT

 

The above electric utilities have filed with the Public Service Commission of West Virginia Integrated Resource Plans (IRP) as required by W.Va. Code Œ24-2-19(a) and Commission Order entered March 19, 2015. The Commission required each electric utility to include the following in the IRP:

 

  1. Summary. The IRP shall include a narrative summary detailing the underlying assumptions reflected in the plan. To better follow the utilityás planning process, the narrative shall (i) include a description of the utilityás rationale for the selection of any particular supply-side or demand-side resource to fulfill its forecasted need, and the utilityás evaluation of alternatives considered for each resource option it has chosen, and (ii) describe the internal planning processes of the utility and how the IRP considers or incorporates PJM Interconnection L.L.C. (PJM) planning and implementation requirements and how it will satisfy PJM capacity obligations.

 

  1. Forecast. The IRP shall include a three-year historical record and a minimum ten-year forecast of the utilityás native load peak demand and energy requirements, and other system capacity or firm energy obligations, if applicable. In addition, there should be a minimum ten-year forecast of the supply-side and demand-side resources expected to satisfy those loads. Peak demand should be presented based on peak demand during the PJM peak demand period and peak demand for the utility if that occurs at a different time.

 

  1. Option analyses. The IRP shall include descriptions, analyses and discussions of supply-side and demand-side resource options that were considered by the utility.

 

The Commission will receive written comments on the IRP filings. Written comments must be filed on or before April 28, 2016, should contain the case number of the specific case in which the comments are being filed, and be addressed to the Commission Executive Secretary, Ingrid Ferrell, Public Service Commission of West Virginia, P.O. Box 812, Charleston, West Virginia 25323.

 

Public Service Commission of West Virginia

 

 